---
title: "Fields Glossary"
canonical: "https://support.appfire.com/space/ART/1577125042/Fields%20Glossary"
format: markdown
---
> Macro (aura-html)

The table below contains only a very limited short list of selected fields, which needed additional clarification. The full list of fields available within the add-on is much larger. In case of any questions regarding any field, please contact [Support](https://appf.re/support).

| **#** | **Field Name** | **Formula** |
| --- | --- | --- |
| 1 | Age (Business days since creation) | Total number of days, <u>**excluding**</u> Saturdays and Sundays, between "Current Time" and Issue's "<u>Created</u>" date time |
| 2 | Age (Calendar days since creation) | Total number of days, <u>**including**</u> Saturdays and Sundays, between "Current Time" and Issue's "<u>Created</u>" date time |
| 3 | Business days since last update | Total number of days, <u>**excluding**</u> Saturdays and Sundays, between "Current Time" and Issue's "<u>Updated</u>" date time |
| 4 | Calendar days since last update | Total number of days, <u>**including**</u> Saturdays and Sundays, between "Current Time" and Issue's "Updated" date time |
| 5 | Days to Resolve (Business) | Total number of days, <u>**excluding**</u> Saturdays and Sundays, between Issue's "Created" date time and Issue's "<u>Resolved</u>" date time |
| 6 | Days to Resolve (Calendar) | Total number of days, <u>**including**</u> Saturdays and Sundays, between Issue's "Created" date time and Issue's "<u>Resolved</u>" date time |
| 7 | Effort Variance | "Time Spent" + "Remaining Estimate" - "Original Estimate" |
| 8 | Effort Variance (Incl. Sub-tasks) | "Time Spent (Incl. Sub-tasks)" + "Remaining Estimate (Incl. Sub-tasks)" - "Original Estimate (Incl. Sub-tasks)" |
| 9 | Percent Complete | "Time Spent" * 100 / ("Time Spent" + "Remaining Estimate") |
| 10 | Scope Change % | ("Time Spent" - "Original Estimate") * 100 / "Original Estimate" |
| 11 | Scope Change % (Incl. Sub-tasks) | ["Time Spent (Incl. Sub-tasks)" - "Original Estimate (Incl. Sub-tasks)"] * 100 / "Original Estimate (Incl. Sub-tasks)" |
| 12 | Projected Scope Change % | ("Time Spent" + "Remaining Estimate" - "Original Estimate") * 100 / "Original Estimate" |
| 13 | Projected Scope Change % (Incl. Sub-tasks) | ["Time Spent (Incl. Sub-tasks)" + "Remaining Estimate (Incl. Sub-tasks)" - "Original Estimate (Incl. Sub-tasks)"] * 100 / "Original Estimate (Incl. Sub-tasks)" |
| 14 | Estimate at complete | "Time Spent" + "Remaining Estimate" |
| 15 | Estimate at complete (Incl. Sub-tasks) | "Time Spent (Incl. Sub-tasks)" + "Remaining Estimate (Incl. Sub-tasks)" |
| 16 | Time entry Date | The date <u>**for which**</u> the time was logged. For example, if a user logs 10 hours for 2018-Sept-24 (Monday), but the time was logged on 2018-Sep-28 (Friday), then ***Time Entry Date = 2018-Sept-24*** and Worklog Creation Date = 2018-Sep-28 |
| 17 | Worklog Creation Date | The date <u>**on which**</u> the time was logged. For example, if a user logs 10 hours for 2018-Sept-24 (Monday), but the time was logged on 2018-Sep-28 (Friday), then Time Entry Date = 2018-Sept-24 and ***Worklog Creation Date = 2018-Sep-28*** |
| 18 | Issue Effort > Time Spent | <u>**Total**</u> time logged on the issue. It is the sum of time from all the worklogs entered on that issue. Individual worklog time is reported via "Time entry: Logged time" field which is described next.<br>Time Spent = Sum(Time entry: Logged time) |
| 19 | Time Tracking (Worklogs) > Time entry: Logged time | This field represents the time logged in each worklog entry. For example if time has been logged as follows on an issue:<br>1 Feb 2019, 1hr, User A<br>2 Feb 2019, 2hr, User A<br>3 Feb 2019, 3hr, User A<br>1 Feb 2019, 1hr, User B<br>2 Feb 2019, 2hr, User B<br>3 Feb 2019, 3hr, User B<br>The dates (1 Feb, 2Feb, 3Feb) are represented by- "Time Entry: date" field<br>Hours (1hr, 2hr, 3hr) are represented by- "Time entry: Logged time" field<br>Users (User A, User B) are represented by- "Time entry: User" field<br>This aggregate value of hours on the issue (12 hours in this example) is stored by Jira on the issue in "Time spent" field which is represented by "Issue Effort > Time Spent" field.<br>Time Spent = Sum(Time entry: Logged time) |