---
title: "Unscheduled tasks panel (old view)"
canonical: "https://support.appfire.com/space/BPEdc/2533524200/Unscheduled%20tasks%20panel%20(old%20view)"
format: markdown
---
## Unscheduled tasks

Unscheduled tasks are:

- Tasks without start and end dates defined
- Tasks with one date (start or end date defined)

Such tasks are easily available from the Unscheduled tasks sidebar in the Resources module for better management.

## View unscheduled tasks

To see unscheduled tasks, open the sidebar on the right.

![unscheduled-tasks-panel.png](media://53712207-c944-4ae1-ba16-00382a3ca174)

## Available columns

The following columns are available in the **Unscheduled tasks** sidebar:

- Key
- Summary
- Start Date
- End Date
- Assignee
- Original Estimate

![unscheduled-tasks-panel-opened.png](media://3056df48-448e-4750-8c91-8bfb33bf8dc3)

## Search box

You can find tasks quickly with the **[search box](https://appfire.atlassian.net/wiki/pages/createpage.action?spaceKey=bpedc&title=000%20Search%20box&linkCreation=true&fromPageId=2533524200)** functionality. The search box operates in two modes:

- Text search
- JQL search

![unscheduled-tasks-list.png](media://644a92c6-6228-45e5-9a77-7fce2a3af319)

## Inline edit

You can quickly make changes (e.g., add dates, change an assignee, modify a summary) with inline editing.

![unscheduled-tasks-inline.png](media://85d77c94-b8db-4fe8-99fa-fe2226569b30)

## Schedule tasks

To schedule tasks, you can:

**Method 1:**

1. Drag a task onto the grid.

2. Make changes if necessary.
3. To confirm, click **Schedule**.

<details>
<summary>Read more</summary>

> ⚠️ Dates **cannot** be added to parent tasks set to Auto bottom-up scheduling mode. Warning appears as parent’s dates depend on the dates of its subtasks.

![image](media://9c298c78-7ed9-4470-aea6-7ccbda814c4a)
</details>

**Method 2:**

Double-click and complete the missing dates.

![unscheduled-tasks-calendar.png](media://1a55a9e7-e9c0-47c0-97ec-a927a62e15e7)