---
title: "Plan delay report"
canonical: "https://support.appfire.com/space/BPEdc/2534212250/Plan%20delay%20report"
format: markdown
---
## About the Plan delay report

Plan delay reports provide information on task delays on all hierarchy levels, with a set **Baseline End Date **field.

![Plan delays window with one row highlighted](media://e38b909f-2027-49a1-822b-16c3533214d6)

Hold the pointer over a task name to display a tooltip with the task's status in round brackets.

Tasks are sorted by **End Date. **

## **Report configuration **

In the plan delays report, you can edit the report configuration to:

- show **only the open delayed tasks **versus the plan - to monitor current delays
- show the **closed delayed tasks** - to check the number of delayed tasks versus the plan after finishing the project

![Plan delays window with no data](media://c9ab69e4-f38b-4ec6-aedd-61498b08c631)

![Plan delays window with template created](media://f17645c2-a4d0-48d7-9a64-7dac4379dbbe)