## Unscheduled tasks

Unscheduled tasks are:

- Tasks without start and end dates defined
- Tasks with one date (start or end date defined)

Such tasks are easily available from the Unscheduled tasks sidebar in the Resources module for better management.

## View unscheduled tasks

To see unscheduled tasks, open the sidebar on the right.

![unscheduled-tasks-panel.png](media://b6f5e146-2f28-487d-81a4-6d7c96d50e36)

## Available columns

The following columns are available in the **Unscheduled tasks** sidebar:

- Key
- Summary
- Start Date
- End Date
- Assignee
- Original Estimate

![unscheduled-tasks-panel-opened.png](media://8c16fb6a-80c8-4121-9648-ca6bf6c9d037)

## Search box

You can find tasks quickly with the search box functionality. The search box operates in two modes:

- Text search
- JQL search

![unscheduled-tasks-list.png](media://2f050195-a5d8-4721-b9a1-51c9e2b3caa0)

## Inline edit

You can quickly make changes (e.g., add dates, change an assignee, modify a summary) with inline editing.

![unscheduled-tasks-inline.png](media://9b720668-90a5-4e74-8943-497ad27d0384)

## Schedule tasks

To schedule tasks, you can:

**Method 1:**

1. Drag a task onto the grid.

2. Make changes if necessary.
3. To confirm, click **Schedule**.

<details>
<summary>Read more</summary>

> ⚠️ Dates **cannot** be added to parent tasks set to Auto bottom-up scheduling mode. Warning appears as parent’s dates depend on the dates of its subtasks.

![image](media://63f18f2f-af0f-4451-b820-8f5e482221a5)
</details>

**Method 2:**

Double-click and complete the missing dates.

![unscheduled-tasks-calendar.png](media://a8b320d9-c731-464c-8c33-07034bcd031e)