> Macro (aura-html)

 **Release date**: 12/8/2025 

Our team is thrilled to announce the latest release of BigGantt!

---

# Enhancements

## Scope definition

### You can narrow down a box scope using Jira labels

The items in a box that have been added to a box (spaces, boards, filters) can be limited to include only the ones that have specified labels. The “AND” operator is used. This field retrieves labels from Jira (data type “Labels”).

For example, the SAFe ART (Smart house) box shown below will contain tasks from PI PLANNING and OBJECTIVES FOR PI PLANNING that also have an “AMBER” label added to them. Items from those spaces without that label are automatically excluded from the scope of the box. 

Multiple labels can be used at the same time. 

![image-20251201-122901.png](media://a1c15550-0167-4f7c-9a41-2f7f1a62885a)

## Task structure

### Link-based builders allow for a more flexible multi-level task tree

The combined use of built-in and link-based structure builders allows for setting up a multi-level structure of similar items (for example, nesting stories under tasks, without the need to create sub-tasks). 

![image-20251201-123758.png](media://3dda90d9-091a-4d41-aefd-934c7ad9953b)

With the task structure set up as shown above, when you manually change the task nesting in the tree, the change is allowed. The items are linked with the “relates” link in Jira, while all items keep the same epic as their parent.

If a built-in builder cannot be used due to its limitations (eg, Epic under Epic, Story under Story), then a Link-based builder is used.

![Task structure based on built-in and link-based.mp4](media://5377e9fb-3a14-4a31-8e63-7db92b0ab974)

**Note**: In the situation below, the built-in builder takes priority despite its second position on the list.

1. Link-based builder (eg. Blocks, Relates)
2. Built-in builder (eg. Epic, Parent)

## UX/UI changes

### Projects renamed to spaces

To align with Jira changes, we have replaced “projects” with “spaces” in our user interface. 

![image-20251201-125954.png](media://efd5ea1d-e5e1-4c32-992f-1bd772ece595)

### In the scope definition, the “Narrow down” section has been renamed to “Additional filters for work items”

![image-20251201-130253.png](media://bfa87336-6a76-4220-ba42-1eb439aa32b2)

---

> Macro (details)
> 
> | **Release date** | 12/8/2025 |
> | --- | --- |
> | **Highlights** | - [enhancements]
>   - You can narrow down a box scope using Jira labels.
>   - Link-based builders allow for a more flexible multi-level task tree
>   - User interface changes. |