title: "BigPicture 8.16.0 Release Notes"
canonical: "https://support.appfire.com/space/DLP/342098621/BigPicture%208.16.0%20Release%20Notes"
format: markdown
---
| Category | Feature description | Sneak peek |
| --- | --- | --- |
| Respect Jira screen scheme | **Prevent editing of fields that aren’t added to the issue screen scheme **<br>**Jira Cloud, Jira Server, Jira Data Center**<br>Use the “[Respect Jira screen scheme](https://appfire.atlassian.net/wiki/spaces/DLP/pages/298387307)” toggle switch to adjust the field mapping settings.<br>When the toggle switch is “on” - if a field can’t be updated in a Jira project, you can’t edit it in BigPicture column views and cards.<br>For example, when you try to edit a task value in BigPicture, the app tries to find a matching Jira issue field in a project. When the field doesn’t exist (that issue doesn’t have it), the app doesn’t let you edit the field.<br>Settings can be adjusted per Jira project, just like other field mapping settings.<br>**Note**: restriction doesn’t apply to fields that have been mapped.<br>![image](media://a058d5ef-1929-4a09-a870-8dc46f8d97bb) | ![image](media://d35bf9cb-d46e-4c40-ac8e-e2feea3c0149) |
| [Inline Editing](https://appfire.atlassian.net/wiki/spaces/DLP/pages/297963003) | **Data type labels - inline editing available**<br>You can use inline editing to add/ remove/ edit the value of a label field.<br>This lets you easily assign tasks to teams and add required skills to tasks. | ![image](media://784cc421-c58b-4209-a15f-c8d94414551a) |
| [Task grouping](https://appfire.atlassian.net/wiki/spaces/DLP/pages/298354243) | **Task Viewer and Task Editor can group tasks (Scope module). **<br>![image](media://48467757-7a46-449a-884f-9c65474d863a) | ![image](media://b5794b06-2c5e-4dce-8be7-c5c90851780e) |
| Overview Columns | **Select data type is available for custom ****[Box columns](https://appfire.atlassian.net/wiki/spaces/DLP/pages/297573377)**** in the Overview module.**<br>![image](media://652dc3b4-5623-4ba0-ae93-b0d22842f21d) | ![image](media://b97d947e-1b9e-4e83-accf-7d25622fa62a) |
| Usability | **Timeboxes synchronized with a Jira “sprint” field - warnings displayed within the app**<br>When **automatic timebox creation** is based on sprints:<br>- It's NOT possible to manually add a new timebox
- It’s NOT possible to manually remove a timebox | ![image](media://cff8cd9a-9be1-49ad-875c-c6f74dc09d1b) |
| **Changes made in the Task Details Dialog are saved when you click outside of the pop-up**<br>You can use inline editing to update a task. When you edit values in the Task Details pop-up, changes are always saved. Even when you just close the pop-up or click outside of the pop-up. | ![image](media://6ec7402d-d3a1-4a6c-bfaf-9216892c44d8) |
| **Message - task period can’t be changed**<br>When a task can’t be moved on a timeline, you see a message explaining why the task can’t be moved. | ![image](media://df32a6b7-32a6-4c36-b215-7405e53a206b)<br>![image](media://cdcfb8bf-147a-4e73-89e9-46b47a788e65) |
| “Manual” tasks - duration behavior | **Duration of a task **(duration working days) is respected by tasks in a **manual mode**. Non-working days are taken into account when rescheduling a task.<br>Example:  
A task start date is Friday. The task Duration is set to 2 days. The task ends on Monday. | ![image](media://1c29c8ab-50ff-4212-99a3-18fe35efbfd5) |
| Column Views | On screens where column views can’t be saved (there is no drop-down to change a column view) - the Box Admin column view setup is treated as the default. Users can restore the admin view.<br>Applies to:<br>- Issue Details WBS Widget
- Board backlog columns
- Risks table view | ![image](media://2b8ca40c-a7ae-4d8d-a2b0-30702c54eefb) |
| Keyboard shortcuts | “Basic item” renamed “basic task” | n/a |