---
title: "Manage issue matrices"
canonical: "https://support.appfire.com/space/IMC/227313203/Manage%20issue%20matrices"
format: markdown
---
> Macro (aura-html)

# Manage your issue matrices

You can *reorder*, *enable*, *disable*, *update*, *copy, *and *delete *Issue Matrices in just a few easy steps. All you need to do is navigate to the Issue Matrices page of a project and make the changes you need. You can get important information about a specific Issue Matrix at first glance.

**To enable/disable, edit, copy, or delete Issue Matrices:**

1. On your Jira Cloud instance, navigate to your **Project settings **or **Project settings > Apps **for *team-managed *projects.
2. On the left menu, choose **Issue Matrix Configuration**.
3. On the **Issue Matrices** page, locate a specific Issue Matrix.
4. Use the available actions in the list: *enable/disable, edit,* *copy, *or *delete*.   
[Learn more about copying issue matrices](https://appfire.atlassian.net/wiki/spaces/IMC/pages/227411345)
5. If you want to change the order of the matrix panels in the issue view, simply drag and drop them up or down in the *Issue Matrices* list.
  

## Update a matrix

You can change the configuration options of your issue matrices at any time.

**To update a matrix configuration:**

1. Just navigate to the **Issue Matrix Configuration** of your project and choose a matrix.
2. Choose an Issue Matrix from the list, and click the *Edit* button (pencil icon) in the action area.
3. Change any options in the** Context**, **Type**, and **Data **sections on the **Edit Matrix** page.
4. Click the **Save **button at the bottom to preserve your changes.

## Manage multi-project matrices

You can reorder or update the configuration of multi-project matrices as you do with single-project matrices. However, the *enable, disable, *and* delete* actions can be performed only on the **Edit Matrix** page of multi-project matrices.

### **Enable or disable multi-project matrices**

You can't enable or disable multi-project configurations from the **Issue Matrices** page. You can perform these actions on the **Edit Matrix **page only.

> ✅ Enable/disable action is applied to **all linked projects** of a multi-project matrix.

### **Delete multi-project matrices**

Multi-project matrices can’t be deleted from the **Issue Matrices** page. You can delete such Issue Matrix only from the **Edit Matrix** page’s **Delete **button next to the **Save **and **Cancel **buttons. The *delete* action will remove the matrix from all projects.

### **Unlink multi-project matrices**

If you want to **unlink **a matrix configuration from a project, you can remove the desired projects from the **Linked Projects** section and then save the configuration.

> ℹ️ **Unlink the current project**
> ℹ️ 
> ℹ️ Using this approach, you can also **unlink **the matrix** from the current project** and then link it to other projects.