---
title: "Unscheduled tasks panel (old view)"
canonical: "https://support.appfire.com/space/SPM/1918864144/Unscheduled%20tasks%20panel%20(old%20view)"
format: markdown
---
## Unscheduled tasks

Unscheduled tasks are:

- Tasks without start and end dates defined
- Tasks with one date (start or end date defined)

Such tasks are easily available from the Unscheduled tasks sidebar in the Resources module for better management.

## View unscheduled tasks

To see unscheduled tasks, open the sidebar on the right.

![unscheduled-tasks-panel.png](media://4bc98136-59cf-416e-8f24-78bcf60db3dd)

## Available columns

The following columns are available in the **Unscheduled tasks** sidebar:

- Key
- Summary
- Start Date
- End Date
- Assignee
- Original Estimate

![unscheduled-tasks-panel-opened.png](media://68675d0e-9fd3-4c67-a794-b2fe39fb1954)

## Search box

You can find tasks quickly with the **[search box](https://appfire.atlassian.net/wiki/spaces/SPM/pages/1918407393)** functionality. The search box operates in two modes:

- Text search
- JQL search

![unscheduled-tasks-list.png](media://8847a5fe-d1ff-4a71-aece-16eb2e83b63e)

## Inline edit

You can quickly make changes (e.g., add dates, change an assignee, modify a summary) with inline editing.

![unscheduled-tasks-inline.png](media://35cd0b2d-5fe4-4e06-a108-2ef6b64fee46)

## Schedule tasks

To schedule tasks, you can:

**Method 1:**

1. Drag a task onto the grid.

2. Make changes if necessary.
3. To confirm, click **Schedule**.

<details>
<summary>Read more</summary>

> ⚠️ Dates **cannot** be added to parent tasks set to Auto bottom-up scheduling mode. Warning appears as parent’s dates depend on the dates of its subtasks.

![image](media://8db06849-7c37-455c-90a9-696ca24bd66a)
</details>

**Method 2:**

Double-click and complete the missing dates.

![unscheduled-tasks-calendar.png](media://ee2be9c3-c917-42c5-9ba3-b0279675d2f7)